• View
  • Changes
  • Options
  • Related
  • Edit
  • , ,  Add +commit
     
  • View
  • Changes
  • Options
  • Related
  • Edit
  • I think this is a routine javascript issue.

     

  • View
  • Changes
  • Options
  • Related
  • Edit
  • it's an easy fix to restore loading calendar.js in head.  unfortunately that adds 84k to initial requests  (prototype is 124k, the html is often ~7-15k range).  so it's a high price for that functionality.  I tried compressing it, and a couple of angles on loading it only when a date editor is requested-- no luck on either score.  there is a general problem here of needing to be able to load cardtype-specific librararies at edit-time. 

     

  • View
  • Changes
  • Options
  • Related
  • Edit
  • View
  • Changes
  • Options
  • Related
  • Edit
  • 2008-01-13

     

    http://connectipedia.org/wagn/test_date

     

    Related support tickets: 
    Relevant user stories: 
     add one

  • View
  • Changes
  • Options
  • Related
  • Edit
  • Fix dates on:

    Date: 2008-9-19
    +blurb  
    +Blog
     

    open

    ...

    in progress

    ...

    coded

    ... ...

    Date: 2008-9-19
    +blurb  
    +Blog
     

    open

    ...

    in progress

    ...

    coded

    ... ...

     

    Notes

    add a note

    Download Docs Sandbox Hosting Support

  • View
  • Changes
  • Options
  • Related
  • Edit
  •  

    Wagn News

    1 to 5 of 24Next-page 1 to 5 of 24Next-page

     

    Ideas

     

     

    Support Tickets



    Wagn at github

    Wheeled by Wagn v. 1.7.2